| Crawl
Space
- 8"x16" poured #3000 (5bag) concrete footings with 2 rows rebar
- 4 courses 8" hollow core block with vents
- Exterior of block will be sealed to approx. ground level
- 2'x2' center support pads and 32" block piers as needed
- 6" Form A Drain (footer tile) around inside and outside of footer (outlet tile is
not included)
- 2" to 4" of pea gravel or similar fill will be spread on interior of crawl
space
- Plastic vapor barrier on interior
- Anchor straps approx. 4' on center
- Treated sill plates with sill seal top and bottom
- Excavation, backfill and rough grade of disturbed area
Spouting
Low-maintenance seamless aluminum gutter and downspouts (optional drainage methods
available on request)
|
Basement
- 8"x16" poured #3000 (5bag) concrete footings with 2 rows re bar
- 8"x8' poured #3500 (5 ½ bag) concrete walls with 5 horizontal rows rebar
- Exterior will be sealed to approx. ground level
- Support pilasters on long walls
- 4" poured #4000 (6 bag) concrete floor over approx. 4" of crushed stone fill
and a plastic vapor barrier
- 6" Form A Drain (footer tile) shall surround inside and outside of footer and run
into a plastic sump hole on inside of basement; tile will be covered with approx. 2' of
gravel (outlet tile is not included)
- Anchor straps approx. 4' on center
- Treated sill plates with sill seal top and bottom
- Two 2817 basement windows
- Basement posts as needed
- Basement stairs (double 2x10 side stringers with 2x10 treads and one handrail)
- Excavation, backfill and rough grade of disturbed area
|
Utility
Hookup
- Water and drain lines connected within and under house, stubbed at foundation wall
(ready for on site hook-up)
- Basement plans without an upstairs utility room include washer and dryer hookups in
basement
- Electric meter base mounted directly outside of electric panel (EP) location (ready for
service from local power company)
- Basement plans include four porcelain light fixtures and two electric outlets in
basement
(Septic system, well, well pump w/ pressure
tank, and/or other on-site utilities are available; prices will vary depending on
condition and location of building site)
Complete Home Warranty
Walk-through check list arranged at completion of construction and prior to move-in for
homeowner's assurance of satisfaction
Homeowner's service and warranty handbook along with Complete package of product
warranties presented for homeowner's reference
Service request form and procedures set up for homeowner's convenience
|